Centra, Castletymon
Automatic Door System Installed at Centra Castletymon, Tallaght
Automatic Door Installation At Centra Castletymon, Tallaght
At A Glance
- Client: Centra Castletymon
- Location: Tallaght, County Dublin
- Industry: Retail
- Key Products/Services: PortAlp Bi-Parting Sliding Doors, Automatic Door Operators, Glazed Safety Screens
- Outcome: Enhanced security, improved customer flow, and energy-efficient automated entrance
About this Project
Client Background
Centra Castletymon is part of a portfolio of 12 stores owned by the client. The project involved redeveloping a former library into a modern convenience store in a busy urban setting.
The Challenge
The main challenges included securing a high-footfall retail space while preserving the building’s unique architecture. Accessibility and fire safety compliance were essential. The draught lobby needed to minimise heat loss and reduce the time the door is open.
The Goal
The project aimed to install a secure and regulation-compliant automated entrance that allowed smooth customer access and one-way exit flow. Integration with existing roller shutters and an energy-efficient frontage were also key goals.
Objectives
- Install a secure, regulation-compliant automated entrance system
- Enable smooth customer access and one-way customer flow
- Integrate new automation with existing roller shutters
- Achieve an energy-efficient and visually appealing shopfront
Products & Services Delivered By Page Electric
These Products Include
- PortAlp Bi-Parting Automatic Sliding Doors
- PortAlp Double Automatic Door Operators
- Custom-Fabricated Aluminium Frames
- Glazed Pocket Safety Screens
Why These Products Were Chosen
- Engineered to suit the building’s unique structural challenges
- Supported one-way customer flow to enhance security
- Seamless automation and sensor technology for easy access
- Compatible with fire safety systems
- Draught lobby design improved energy efficiency
Project Implementation
Execution & Coordination
Page Electric collaborated with architects, engineers, and contractors to design a custom solution. Engineering assessments ensured the doors fit the old library structure, with modifications to glazing for safety
Onsite Collaboration
Installation involved fitting the door systems behind pre-installed roller shutters. Careful alignment overcame structural inconsistencies. Final system testing ensured compliance with safety standards.
Results
Project Outcome
The project delivered a secure, efficient, and attractive glazed shopfront with automated entry and one-way customer flow. Loss prevention was enhanced through controlled access. The system fully met EN16005 and fire safety regulations.
Key Results
- Secure and regulation-compliant automated entrance
- Seamless and efficient customer access
- Energy savings through draught lobby design
- Enhanced theft prevention
Project Duration
The total project duration was 1 month from planning to installation.
Need A Similar Solution?