Cresent Shopping Centre, Limerick
Shop Front Installed For Tesco at Crescent Shopping Centre, Limerick
At A Glance
- Client: Precision Construction
- Industry: Retail
- Location: Crescent Shopping Centre, Limerick
- Products: Fixed Screens for shopfront
Client Background
Tesco was opening a new unit within the Crescent Shopping Centre. Previously, Tesco operated two separate units – one for clothing and one for groceries – located on opposite sides of the shopping centre. The availability of a unit adjacent to the food store presented an opportunity to relocate the clothing department, allowing both units to be positioned side by side for improved customer convenience.
The Challenge
The installation had to be completed within a busy, fully operational shopping centre, where safety, visual consistency, and minimal disruption were critical. The new shopfront also needed to align precisely with the centre’s existing interior design, meeting both architectural specifications and strict centre management requirements.
The Goal
Products & Services Provided
These products included
Page Electric supplied and installed:
- New shop front
- Glazed screens
Why These Products Were Chosen
- Engineered to suit the building’s unique structural challenges
- Supported one-way customer flow to enhance security
- Seamless automation and sensor technology for easy access
- Compatible with fire safety systems
- Draught lobby design improved energy efficiency
Project Implementation
Unique Conditions
Working in a live shopping centre environment required careful planning to minimise disruption to the public and surrounding retail units. Installation was carried out during off-peak hours to maintain safety and efficiency throughout the project.
Results
Project Outcome
Page Electric successfully delivered a new shop front that combined durability, safety, and modern design. The completed installation provided maximum visibility into the new Tesco unit while perfectly matching the existing interior of the shopping centre.
Project Duration
The project was completed on time and within specification, ensuring the unit was ready for opening as scheduled. The installation phase took two days, with the entire project delivered within eight weeks from proposal to final safety checks.
See news article:
Need A Similar Solution?
Other Case Studies
Request a Quote
Ready to Work Together? Get in Touch!
Operating across entire Ireland
sales@pageelectric.ie
01 2989781
Trusted by
Our Clients









With over 30 years of experience, Page Electric has grown into one of Ireland’s leading providers of door and shopfront solutions. We pride ourselves on rapid quotations, fast turnaround times, and a highly skilled team. At Page Electric, we believe in reliability, craftsmanship, and long-standing relationships.