Cresent Shopping Centre, Limerick

Shop Front Installed For Tesco at Crescent Shopping Centre, Limerick

At A Glance

  • Client: Precision Construction
  • Industry: Retail
  • Location: Crescent Shopping Centre, Limerick
  • Products: Fixed Screens for shopfront

Client Background

Tesco was opening a new unit within the Crescent Shopping Centre. Previously, Tesco operated two separate units – one for clothing and one for groceries – located on opposite sides of the shopping centre. The availability of a unit adjacent to the food store presented an opportunity to relocate the clothing department, allowing both units to be positioned side by side for improved customer convenience.

The Challenge

The installation had to be completed within a busy, fully operational shopping centre, where safety, visual consistency, and minimal disruption were critical. The new shopfront also needed to align precisely with the centre’s existing interior design, meeting both architectural specifications and strict centre management requirements.

The Goal

To deliver a shop front that matched the aesthetic and structural requirements of the Crescent Shopping Centre.

Products & Services Provided

These products included

Page Electric supplied and installed:

Why These Products Were Chosen

  • Engineered to suit the building’s unique structural challenges
  • Supported one-way customer flow to enhance security
  • Seamless automation and sensor technology for easy access
  • Compatible with fire safety systems
  • Draught lobby design improved energy efficiency

Project Implementation

Unique Conditions

Working in a live shopping centre environment required careful planning to minimise disruption to the public and surrounding retail units. Installation was carried out during off-peak hours to maintain safety and efficiency throughout the project.

Results

Project Outcome

Page Electric successfully delivered a new shop front that combined durability, safety, and modern design. The completed installation provided maximum visibility into the new Tesco unit while perfectly matching the existing interior of the shopping centre.

Project Duration

The project was completed on time and within specification, ensuring the unit was ready for opening as scheduled. The installation phase took two days, with the entire project delivered within eight weeks from proposal to final safety checks.

See news article:

Need A Similar Solution?